Knowledge

JEM has the technology and knowledge cultivated over many years of experience.
Here we introduce some of the know-how we have accumulated through our actual onsite activities.

Knowledge illustration list

Knowledge list

Heading

  • Six Methods for Groundwater Control in Shaft Excavation
  • Verification Items During PS Anchor Testing
  • Technical Inheritance and Digitization for Large-scale Excavation
  • Strength Specifications for Shotcrete on Slopes
  • Grouting for Groundwater Treatment in Upward PS Anchor Holes in Underground Power Plants Arches
  • Standards for Groundwater Treatment in PS Anchor Holes in Underground Power Plants Arches and Water Stopping
  • Measures to Improve PS Anchor Cycle Time
  • Causes of Variability in Load Measurement Values of PS Anchor Load Cells
  • Encountered Expansive Mudstone Geology During Tunnel Construction
  • Planned Layout for Underground Power Plant Work Shafts in Mudstone Geology
  • Historical Changes in Japan's Underground Power Plants
  • Rain Measures Unique to Tropical Rainforests
  • Curtain Grouting Above the Underground Power Plant Cavern
  • Tunnels Using NATM Method
  • The underground cavities excavated for power plants in mudstone geology.
  • Upward Drilling and Insertion of PS Anchors
  • Management Values for Elongation During PS Anchor Tensioning
  • Points to Note During Manufacturing of Covering formwork of Large sectional Arch Lining Concrete
  • Fundamental Technologies for Underground Power Plant Cavern Construction
  • Rapid-setting Materials for Shotcrete
  • Shaft Winch Repairs Completed After an Accident
  • Concrete Placement for Water Pressure Steel Pipe Shafts
  • Special High-altitude Work Vehicles Used at Underground Storage Base Sites
  • Standards for Concrete Placement in Arch Linings for Underground Power Plants
  • Basic Review of Changed Underground Power Plants Construction Plans
  • Vibration Control from Blasting at PS Anchor Anchorage Sections
  • Causes of Increasing Load Cell Values of Upward PS Anchors in the Arch Sections of Underground Power Plants
  • Safety Factors Used in Underground Power Plants Cavern Design
  • Management Standards for Excavation in Underground Power Plants Arches
  • Rock Support for Large-section Underground Power Plant Arches
  • Management Standards for Wire Elongation During PS Anchor Tensioning
  • Analysis of Underground Cavities
  • Filling of Over Cutting Tunnels
  • Blasting for Invert of Large-section Tunnels
  • Drilling Diameter for Rock Bolts and Method of Grouting
  • Downward Installation Angle of Sidewall Rock Bolts and Mortar Filling Behind Washers
  • Concrete for Large-section Diversion Tunnel Linings
  • Displacement Measurement Associated with Tunnel Excavation
  • Days Required for Arch Lining Work in Underground Power Plant Caverns
  • Installation of Upward Rock Bolts
  • Measures to Prevent Fall of rocks at Tunnel Faces
  • Evacuation During Tunnel Blasting
  • Form Removal Time and Concrete Strength for Large-section Tunnel Arch Concrete
  • Preparation of Construction Plans for Large-section Diversion Tunnel Linings
  • Details of Covering formwork for Large-section Tunnel Arch Lining
  • Concrete Placement for Large-section Tunnel Arches
  • Reinforcement Assembly for Large-section Tunnel Arches
  • Pre-investigation and Displacement Measurement Plan Before Starting Underground Power Plant Caverns
  • Management Standards for Elongation Values During Tensioning of PS Anchors in Underground Arch Sections
  • Geothermal Measurement Inside Tunnels
  • Differences Between Load Cell Indications and Tension Jack Readings for PS Anchors
  • Installation of Underground Displacement Gauges
  • Investigation of a 100-year-old Power Plant Waterway Tunnel
  • Cutting Slope Protection Works at Tunnel Inlets
  • Groundwater Amounts Feasible for Shaft Excavation and Sheet Piling for Shafts
  • Construction Considerations for Water Conveyance Tunnels and Water Pressure Pipe Shafts
  • Secondary Grouting Below PS Anchor Packers
  • Grouting Construction Plan for Power Plant Waterway Tunnels
  • Turbidity Treatment Facilities for Power Plant Construction and Tunnel Inlet Construction and Slope Cutting
  • Lahar Layer Water Pumping and Pump Test Inside Shafts
  • Measurement Management Plan for Large-section Tunnels in Shirasu Soil
  • Preparations Before PS Anchor Installation
  • Verification After Completion of PS Anchors in the Underground Arch of the Power Plant